Construction service from empty land to finished home

One accountable team that delivers every stage with clear program, tidy sites and strong structure. From survey and groundworks to interiors and handover.

Survey and plan

We begin with a measured survey of the plot, adjoining land and utilities. We establish levels, boundary evidence and access constraints, then translate your brief into a coordinated design and cost plan. Risks are surfaced early and logged with the mitigation route.

Deliverables

  • Measured survey, topographic model and services map
  • Concept drawings evolving to planning and technical packs
  • Outline program with stage gates and decision points
  • Cost plan with provisional sums and exclusions clearly defined

Approvals and strategy

Planning route, building control route, party wall notices, ecology and tree protection if relevant. We set the inspection schedule and information required at each hold point.

Quality and risk

  • Soil type and foundation strategy notes
  • Constraints register (access, drainage, neighbours)
  • Health and safety pre-construction plan

Site setup and strip

We secure boundaries, set welfare and power, agree delivery routes and protect pavements and trees. Unwanted elements are removed with controlled waste handling to create a safe, tidy platform.

Setup

  • Hoarding, signage and security
  • Temporary power and water
  • Permit management and traffic plan

Soft strip

Selective demolition and waste segregation for recycling, keeping neighbours informed and disruption low.

  • Safe access routes and clear storage zones
  • Tree protection and pavement safeguarding
  • Waste transfer notes and compliance

Groundworks and foundations

We set out with datum points, excavate footings, install rebar and concrete to the engineer’s design. Drainage, ducts and sub-base are formed and tested before the slab or beam-and-block is poured or laid.

Inspections

Building control footing check and pre-pour approval with photo records at each hold point.

Materials

  • DPM/DPC and rigid insulation
  • Concrete and reinforcement mesh
  • Compacted hardcore and sand blinding
  • Laser set-out and profiles
  • Footings and slab to spec
  • Drains and ducts tested

Structure and frame

We construct the load path in masonry, timber frame or steel. Openings are formed, beams and lintels are set, and the building is braced and safe with restraint and ties to engineer notes.

Engineer coordination

Connection details, bearing and padstones confirmed on site. Variations are recorded and approved before proceeding.

Safety and logistics

Clear routes, clean decks, segregated storage and lifting plans keep the site efficient and safe.

  • Masonry/steel/timber frame erected
  • Lintels, beams and straps installed
  • Temporary works and bracing in place

Roof and envelope

We complete the roof structure and coverings, then make the shell weathertight with windows and doors. Fascias, gutters and downpipes finish the envelope so internal services can start.

Roof systems

  • Trusses or cut roof
  • Tiles, slates or warm flat roof membranes
  • Roof lights and flashings

Openings

High-performance windows and doors with tested air and water seals to improve comfort and efficiency.

  • Weathertight certificate achieved
  • Gutters and downpipes fitted
  • Air-tightness details completed

First fix MEP

We place cables, pipework and ventilation runs before walls close. Consumer unit, heating loops and MVHR (if specified) are positioned to plan and tested for continuity and pressure.

Electrics

Ring mains, radial circuits, lighting runs and data pre-wires labelled and photographed for records.

Plumbing & heating

Hot/cold, wastes, underfloor or radiator circuits, manifolds and boiler/plant locations prepared.

  • First fix complete drawings marked-up
  • Test certificates path agreed
  • Ventilation and extract routes set

Plaster and screed

We insulate, board and plaster walls and ceilings for a smooth base. Floors are screeded level to receive finishes, with movement joints where required.

Fabric

Thermal and acoustic insulation fitted to specification with vapour control layers where required.

Surfaces

Plaster systems, trims and reveals to achieve crisp corners, even planes and consistent finishes.

  • Ready for prime and mist coats
  • Floor levels checked to tolerance
  • Moisture readings acceptable

Second fix and fit out

Rooms take shape: doors, skirting and stairs go in; kitchens and bathrooms are fitted; sockets, switches and sanitaryware are connected. Protection stays in place to the end.

Joinery

Internal doors, architraves, skirting, window boards, wardrobes and bespoke carpentry to schedule.

Kitchens & bathrooms

Cabinetry, worktops, appliances, sanitaryware and tiling installed with clean detailing and sealed junctions.

  • Second fix electrics and plumbing complete
  • Finishes protected during moves
  • Appliance testing and commissioning plan

External works

We complete the outside: paths, patios, driveways, steps and retaining details; boundary treatments, gates and services covers. The plot is graded, drained and left clean.

Hard landscaping

  • Patios, paths and steps
  • Driveways and thresholds
  • Retaining walls and edgings

Boundaries & drainage

Fencing and gates installed; drain covers aligned, gullies set, surface water directed away from structures.

  • Falls checked for water run-off
  • Manholes and covers to level
  • Site cleaned and demobilised

Snag and handover

We walk the home room by room with you, record and close snags fast, then provide manuals and certificates. You receive keys, contacts and an aftercare plan. We remain available for support.

Handover pack

  • Operation & Maintenance file
  • Electrical and gas certificates
  • Warranties and care guides

Aftercare

Optional planned maintenance and a swift response in the initial period for any settling issues.

  • Snag list walk and sign-off
  • All documents issued
  • Keys and contacts provided

Construction questions

Clear answers for the most common points during a new build or a major renovation.

Can you start from a blank plot

Yes. We handle the full route from survey and permissions to handover. You can also invite us for one part only.

Do you manage approvals and inspections

Yes. We plan all building control checks and arrange engineer sign off where required.

How do you control quality

Each stage has a checklist and a sign off. You receive weekly updates with photos and notes.

What about neighbours and access

We agree access routes, keep the street clean and protect boundaries. Good relations help the program.

Ready to plan your project

Tell us about your home and we will prepare a clear proposal and timeline.